Earthworks calculators
How far the ground has to come down (cut) or go up (fill) to reach finished level at each end of the length. Same all over? Put the same in both. If one end is cut and the other is fill, it works out where they meet.
Shrink: 1 m³ dug out of the ground ends up about 0.9 m³ once compacted as fill (10 %). Bulking and shrink are rules of thumb, so change them to suit your ground.
Depth is the finished, compacted thickness.
Typical extra: road base or fill 25–30 %, sand or crusher dust 15–20 %, topsoil or mulch 20 %, aggregate 5–10 %. Weights are loose and dry. These are rules of thumb, so change them to suit your supplier.